H.H. TECHNOFAB CORPORATON
ABOUT USAbout UsProjectsServicesAwardsExportsClientsContact UsHomeDownloads
MAIN PROJECT DONE BY HHTC
Project:

GHAZI-BAROTHA Hydro Power Project

Contractor: Ghazi Barotha Contractors. (China + Pak)
Location: Dist Attock, Pakistan
Tenure: 1996~2000
Project Value: Approx Rs. 126 Millions
   
HHTC’s participation in the project:
1.
Fabrication of Concrete Batching Plant C01 and C02 Approx 650 Tons Each.
2.
Fabrication and Erection of Cement Storage Silos 100,200 and 300 Tons Capacity.
3.
Fabrication of Light Towers. (174 Tons).
4.
Fabrication of Water Pipeline 14” ? 7000 Meter Long (130 Tons) with both side flanges.
5.
Fabrication of Steel Structure of Retaining Walls Approx 100 Tons.
6.
Fabrication and Erection of Steel Yard Sheds, Fly Ash Storage Shed and Compressor Shed Approx 125 Tons.
7.
Fabrication of Anchor Pads 15 Tons.
8.
Fabrication and Galvanization of Anchorage & Plates (Nozzing) (300 Tons).
9.
Fabrication and Galvanization of Steel Cat Ladders.( 34 Tons).
10.
Fabrication of U.G. Towers in different Hights, complete with Nuts and Bolts.
11.
Fabrication of Steel Floating Pontoons.
12.
Fabrication of Conveyors 600 x 25M to 30M, Screw Conveyors.
13.
Fabrication and Galvanization of Lifting Devices.
14.
Fabrication of Crane Beams.(160 Tons).
15.
Fabrication of Bentonite/Klin.(35 Tons).
16.
Fabrication of Stac Launching and Pads.(200 Tons).
 
Project:

Quaid-e-Azam International Airport

Contractor: Sogea International (French)
Location: Karachi, Pakistan
Tenure: 1990~1992
Project Value: Approx Rs. 40 Millions
   
HHTC’s participation in the project:
Our sizable project, which we completed successfully, was the fabrication and erection of Mild Steel, Stainless Steel and Aluminum finishing joineries. We also fabricated and installed specialized secondary structure nosing weighing 20 tons and drainage accessories at Quaid-e-Azam International Airport, Karachi.

We worked as one the largest subcontractors to French company M/s Sogea Pakistan who were awarded the main contract.

Appended below is a brief summary of our involvement in the building and site development of the above mentioned project specially highlighting the fabrication and erection works.
   
1.
We have largely used Aluminum profile of 200 x 70 mm which is the largest profile used in Pakistan covering an area of 12000 Square meters in curtain walls with 31 mm thick Sietral Glass.
2.
Glazing partition with 6 mm wire mesh fireproof glass approx. 700 square meters.
3.
Divider Screens between International and Domestic wings approx. 250 square meters.
4.
Doors, windows, main entrances, automatic doors and smoke outlets.
5.
Provision of Seismic joints in full length glazed curtain walls.
6.
We have fabricated at our workshop all steel and stainless steel support devices and inserts for Aluminum Curtain Walls.
7.
Sheet metal Expansion Joint on entire project.
8.
Fabrication and erection of 63 meter long visitors bridge in mild steel rectangular piping (150 x 300 x 12)mm.
9.
Erection & Installation of Traveling Crane 20 Tons.
10.
Fabrication of ladders, Stairs & Cat Ladders for entire project site.
11.
HVAC Piping jobs complete with testing reports.
12.
Erection of Flood Light Towers & Light Poles.
13.
Scaffolding of all types having serviceable height upto 45 meters.
14.
Hand balustrades, windows & louvers.
15.
Mild steel section modular panel.
16.
Fabrication and erection of steel screens for face sewage station.
17.
Steel Grating and Checkered Plate Coverings.
18.
Fabrication and Erection of Trusses of metal work in shed of 40 x 80 x 6 meters.
19.
Nozzing with Epoxy coating in Apron area approx 24 tons.
20.
Under ground water irrigation system.
21.
Aluminum foot step guard Nozzing at entire Departure Bridge.
22.
Stainless steel Chandler hanging Hoist and inserts with Installation.
 
Project:

PSO Piper Terminal

Contractor: Promet Engineering PTE Ltd. (Italy)
Location: Karachi, Pakistan
Tenure: 1994~1996
Project Value: Approx Rs. 65 Millions
   
HHTC’s participation in the project:
1.
Construction of miscellaneous reinforce concrete foundations.
2.
Construction of warehouse and workshop.
3.
Construction of condensate tank.
4.
Construction of reinforce concrete in-ground structures-API separator; API Skimmed Oil Pit and Slops Tanks.
5.
Construction of treated and Make-up Water Tanks.
6.
Construction of Foundations to Water and Condensate Tanks.
 
Project:

Fish Harbour Project

Contractor: Lodigiani Spa (Italy)
Location: Karachi, Pakistan
Tenure: 1989~1991
Project Value: Approx Rs. 8 Million
   
HHTC’s participation in the project:
1.
Mild steel Pier Fender with Rungs and bolts approx. 55 Tons.
2.
Complete fabrication and erection of Flood light tower weighing 130 Tons, and 26M high. All the towers finished in hot dip Galvanizing.
3.
Mild steel Floating barges for bracing control of size 2m x 3m x 6m long weighing approx 30 Tons.
4.
Fabrication of steel shuttering (Form work) of different size and shape of 35M long approx 30 Tons.
5.
Heavy duty main doors for new fish market with sliding system.
6.
Erection of work shop shade.
7.
Fabrication of mobile office container for site.
8.
Fabrication of steel ladder for control tower building.
9.
Fabrication of louvers type steel doors and windows for Transformer room.
10.
Installation of checkered plate Trenching cover in all new sub station.
11.
Erection and installation of heavy duty Steel gate for boundary wall.
 
Project:

New Terminal Complex at Allama Iqbal
International Airport, Lahore

Contractor: Civil Aviation Authority
Location: Lahore, Pakistan
Tenure: 2003
Project Value: Approx Rs. 7.65 Millions
   
HHTC’s participation in the project:
1.
Fabrication & Installation of Stainless Steel Planters.
2.
Fabrication & Installation of Stainless Steel Heavy Duty Waste Disposal Bins.
3.
Fabrication & Installation of Furniture for Concourse Hall.
4.
Fabrication & Installation of Canopy over Ramp.
5.
Fabrication & Installation of Bumper Guards.
 
Project:

Construction of Pre-Fab Building Systems at New Terminal Complex at Allama Iqbal International Airport, Lahore

Contractor: Pakistan International Airline
Location: Lahore, Pakistan
Tenure: 2002-2003
Project Value: Approx Rs. 12.52 Millions
   
HHTC’s participation in the project:
1.
Construction of Cargo Sheds.
2. Construction of Custom Sheds.
3.
Construction of Fruit Sheds.
4.
Various extensions to existing sheds.
 
Project:

Pre-fab Industrial Buildings

Contractor:  
Location: Pakistan
Tenure: 1999-2001
Project Value: Approx Rs. 112 Millions
   
HHTC’s participation in the project:
1.
Construction of various Pre-Fab Industrial Buildings at their various sites.
 
Project:

Rice Processing Plants

Contractor: Al-Mahd International
Location: Pakistan
Tenure: 2002-2003
   
HHTC’s participation in the project:
1.
Steel Structural Work for Rice Processing Plants.
2. Erection and Installation of Machinery & Equipment.
 
Project:

Rice Processing Plants

Contractor: Chawala International
Location: Pakistan
Tenure: 2003 and running
   
HHTC’s participation in the project:
1.
Steel Structural Work for Rice Processing Plants at Karachi and Larkana Sites.
2. Erection and Installation of Machinery & Equipment at Karachi Site and Larkana Site.
 
Project:

Manifold Structure at OP II Project

Contractor: China Harbour Engineering (Group)
Location: KPT Karachi
Tenure: 2004 and running
   
HHTC’s participation in the project:
1.
Fabrication, painting, erection of Manifold Structure at KPT.
2. Drilling of Holes in Rubber Fenders.
3. Additional Steel Structures required at Project.
 
STEEL STRUCTURAL SUPPLIES BEING MADE TO OUR VARIOUS
CLIENTS:
 
Client:

Fatema Trading Co LLC, UAE.

Location: United Arab Emirates
Tenure: Since 2001
   
Detail of Jobs performed:
Fabricated Items with Polishing/Powder Coating/Epoxy Coating:
1.
Stainless Steel Pipe Fixing Clamps Dia 1200mm.
2. Stainless Steel Anchor Bolts Dia 1”
3. Stainless Steel Lifting Key Dia 12mm
4. Mild Steel U Clamps
5. Aluminium Solid Ladders
6. Aluminium Extruded (Hollow Pipe) Ladders
7. Chain Link Fencing Accessories.
8. Mild Steel MITO Square Tube
9. OVENS of size 20ft x 12ft x 14ft high.
10. Stainless Steel Wire Rope Ends Ferrols
11. After Filter for Cyclone
12. Grid Dust Seperator
13. Acoustic Canopy
14. MS Turn Buckle
15. MS full threaded studs of M24
16. MS Anchor Plates
17. GI Wire Rope
   
Casted Items with Powder Coating:
1. Bronze Duct Markers
2. Bronze Indication Plates
3. Bronze Information Plates
4. Bronze Clamps Dia 100mm, 150mm
5. Aluminium Surface Box
6. Aluminium Fire Hydrant Box
7. Aluminium Stop Valve Box
8. Aluminium Sealing Flanges, Dia 150mm, 200mm, 300mm, 400mm, 600mm, 900mm, 950mm, 1200mm, 1400mm.
9. Aluminium Brackets for fixing of Aluminium Ladders.
10. Aluminium Ventilation Pipe of 80mm, 100mm & 150mm Diameter.
11. Aluminium Hand Railing
12. Aluminium Pull Box
13. Aluminium Median Railing approx 45 Tons
14. Aluminium Decorative Fencing approx 8 Tons
15. Aluminium Fencing 1.7 Mtr high for 2.5 Kilo Meters
 
Client:

Sedco Forex Schlumberger

Location: Islamabad
Tenure: Since 1998
   
Detail of Jobs performed:
1.
Construction of Mobile Containers site accommodation of 40’ x 10’
2. Fabrication of Trolley Beams.
3. Fabrication and Maintenance of Spool & Poor Boy Degasser.
4. Fabrication of Crane Beam of 10 Tons.
5. Fabrication of SS Panel Boxes.
6. Fabrication of Deck Pipe Roller.
7. Fabrication of Waste Bin and Spill Collector.
8. Fabrication of Platforms for Man Rider winch with Pedestals.
9. Fabrication of Various Equipment Skid.
10. Stainless Steel Wire Rope Ends Ferrols
11. Fabrication of Mud Collection Tanks.
12. Provision of Technical Staff for maintenance/overhauling at RIG.
13. Supply of Welding Plants, Air Compressors with Operators on rental basis.
 
Client:

Clough Engineering Group

Location: Dhodak Oilfields
Tenure: Since 1998
   
Detail of Jobs performed:
1.
Fabrication of Lifting Beams of 5 tons to 30 tons lifting capacities.
  1 No. Dinning Hall with Kitchen.
  3 Nos. Two men Bed room with attached bathrooms with Kitchen.
  4 Nos. Three Bedrooms with attached bathrooms.
  1 No. Office Block.
  2 Nos. Eight person four Bedrooms.
  1 No. Bathrooms and shower units with Laundry.
2. Boundary Wall Fencing with Linked wire Net with Double Doors.
3. Complete Fabrication of workshop shed covering an area of 13000 square feet.
4. 120 different types of Cast in Items (embedded in concrete) weighing 60 Tons treated with Hot Dip Galvanizing.
 
Client:

Alcatel Pakistan ltd.

Location: Karachi
Tenure: Since 1994
   
Detail of Jobs performed:
1.
Manhole Cover frames 300 nos.
2. Manhole Cover 800 Nos. with locking system.
3. Cable brackets for cable laying 1500 Nos. of 15 different types with hot dip galvanizing.
4. Under Ground Cable support brackets.
5. Cable clamps of aluminum die casting.
6. Pulling Hook for 18000 lines cable.
7. Cable curve support brackets with handle.
8. Lifting hooks for main hole covers.
9. Sign cones 300 Nos.
10. Road signs 120 Nos.
11. Knave cable clamps
12. Cable Sleeves
13. Cable Diversion Rollers 2 x 3 rollers 18 Nos.
14. Edge rollers
15. Triple roller cable supports
16. Cable splicing container
17. Toe Drum Trailer capacity of 10 Tons, 4 Nos.
18. Panel Base access 100 nos.
19. Optic fiber splicing mobile unit with all the necessary equipment.
20. Some of the key equipments were provided by us on rental basis to facilitate site working.
  Diesel driven Air compressor with jack and Trolley 2 Nos.
  Pneumatic Jack Hammers 5 Nos.
  Cars, Trucks and Pickups.
 
Client:

Boots Pakistan Ltd.

Location: Karachi
Tenure: Since 1990
   
Detail of Steel Structures:
1.
Complete fabrication and erection work in Pharmaceuticals project of Boots Pakistan Ltd.
2. More than 12000 Nos. mild steel and 300 Nos. stainless steel Pallets of 16 BWG.
3. Complete Racking system for Raw material store, Bottles store, finished goods store, Spare area and cold storage.
4. Design and Fabrication of stainless steel Bottle washing plant and Dryer.
5. Stainless steel Vessels of assorted size approx. 50 Nos.
6. Fabrication and Erection of Monorail of 2 Tons.
7. Fire exits stairs of mild steel checkered plates.
8. Stainless steel ladders and platforms.
9. Erection and Installation of Glatt Fluid Bed dryer.
10. Stainless steel double Cone blender 1200 Liters capacity.
11. Stainless steel Powder mixing Drum.
12. Mild steel Ladies and Gents Lockers 1000 Nos. and M S Cabinets.
13. Fabrication and Erection of M.S. Shed for storage of drums covering an area of 12600 square meters.
14. Fabrication and Fixing of Industrial Kitchen, shelves, Cabinets, exhaust hood and other Kitchen related items.
15. Stainless steel Conveyers upto 90 ft longs for packing halls.
16. Stackable Drum Pallets 500 Knows.
17. Stainless steel cabinets, Dispensing Table, trays, trolleys, and stainless steel hoods.
18. Complete boundary wall Grills with chain links and H D Gates.
19. Stainless steel jacketed Vessels with Platform.
20. Erection and Installation of Johnson filter press, Blenders and mezzanine floor.
21. Complete Mild steel structure shed for cycle stand.
22. Over Head diesel storage tank.
23. Fabrication of Burning Chamber.
24. Installation and commissioning of fresh Air and Ventilation ducts.
25. Shelving system for Engineering store with Mezzanine floor.
26. Stainless steel and Mild steel Grating in Production area and HVAC plant room respectively including checkered plates footboards.
27. Installation of Gas line, Water line and Air intake line.
28. Erection of Pipe structure for Green house.
29. Heavy Duty Sheet Metal Doors with insulation and locking system of complete project.
30. Galvanized sheet Cable trays and trenching at entire project site.
 
Client:

Wellcome Pakistan Ltd.

Location: Karachi
Tenure: Since 1991
   
Detail of Jobs performed:
1.
Erection and fabrication of Boiler chimney 18 inches in Dia x 40 ft. height.
2. Kerosene storage tank of 10000 liters.
3. Racking system in warehouse and in stores.
4. Mild steel Pallets of 16 BWG 2000 Nos.
5. Stainless steel Conveyer of 120 Rft.
6. S.S Trolley of different size and type with SS Trays.
7. S.S Laminar flow stand, steel Hatch, shoes barriers, towel stands, cabinets, stainless steel sinks and many other utilities in new project.
8. Fabrication and Jacketing of 1500 liter service vessel.
9. Supply and installation of GI pipe lining for pesticide plant.
10. S.S Trolleys, S.S assorted size boxes and working benches.
11. S.S air supply system in coating pan.
 
Client:

Intairdrill Pakistan

Location: Badin, Sindh
Tenure: Since 1993
   
Detail of Jobs performed:
1.
Barges 3m x 8m x 4m H x L x W.
2.
Mobile containers site accommodation and ancillary services caravans of 40ft x 10ft. :
  5 Nos. Bed sleeper with attached bathrooms.
  1 No. Dispensary unit with first aid room and attached bathroom.
  1 No. Dinning unit with kitchen.
  2 Nos. Office unit with bathrooms amenities.
3. Mild steel Lockers, cabinets and wardrobes.
4. Spreader bars and other fabrication items.
 
Client:

Siemens Pakistan Ltd.

Location: Karachi
Tenure: Since 1997
   
Detail of Jobs performed:
1.
Generator Toe Trolley for 34,60,70 and 210 KVA Power Generating sets.
2. Canopy for the above trolleys.
3. Acoustic Canopy for 70, 34, and 210 KVA Generating Sets.
4. Mobile Containers 13 Nos., 20ft and 40ft.
 
Client:

Color Ital Pvt. Ltd.

Location: KIA, Karachi.
Tenure: Since 2003
   
Detail of Jobs performed:
1.
Fabrication of Stainless Steel Furniture & Fixtures
  a. Stainless Steel Trolleys
  b. Stainless Steel Tables
  c. Stainless Steel Bowl/Vessels/Drums
  d. Stainless Steel Rollers
2. Fabrication of MS Palettes
3. Fabrication of Stainless Steel Tanks
 
Client:

Contrak International Inc.

Location: C/O. US Embassy, Kabul, Afghanistan
Tenure: Since 2003
   
Detail of Jobs performed:
1.
Fabrication of Porta Cabins.
 
Client:

ENAR Petrotech Services (Private) Limited

Location: Karachi, (National Refinery Pvt Ltd.)
Tenure: Since 2002
   
Detail of Jobs performed:
1.
Stainless Steel Float Level Gauges for 4000mm Dia Tank with guide wires and supporting structures.
2. Stainless Steel Float Level Gauges for 2000mm Dia Tank with guide wires and supporting structures.
3. Fabrication of complete Oil Separation Skimmer.
4. Manufacturing of Bronze over Pressure Relief Valves, Vacuum Relief Valves and Liquie Over Flow Valves.
 
Client:

VOLVO Pakistan Ltd.

Location: Karachi
Tenure: Since 2001